Co-Founder and Director of Eastern Node

A Successful Pilot Test Of Zeofixer, Shanghai Jiao Tong University, Shanghai

In September 2020, Zeofixer®, a silicon-based phosphorus sequestering agent, was applied to a water body in Shanghai to reduce the phosphate concentration in the overlying water and permanently “cap” the sediment.

Location of the Pilot Test

The water body for this pilot test is located in the agriculture institute of Shanghai Jiao Tong University, Minhang District, Shanghai, China. The water surface area is about 0.2ha, the water depth is between 1.5m and 2.2m, and the sediment thickness is around 1m.

Shanghai Jiao Tong University is one of the famous institutions of higher learning with the longest history and reputation at home and abroad. It is a national key university directly under the Ministry of Education and jointly built with Shanghai Municipality. After 125 years of unremitting efforts, Shanghai Jiao Tong University has become a domestic first-class and internationally renowned university, and further defined the vision on constructing a “comprehensive, innovative and international” world-class university.

university rankings of shanghai jiao tong university
University Rankings of Shanghai Jiao Tong University
location-of-the-pilot-test-shanghai
Location of the Pilot Test in Shanghai

The On-Site Trial

on-shore-spray-shanghai
Pilot Test on the Water Body in Shanghai Jiao Tong University

The pre-treatment total phosphorus concentrations in the water body were 1.36-1.80mg/L, and the concentration of PO4-P was 1.07-1.20mg/L.

In September 2020, Zeofixer®, a silicon-based phosphorus sequestering agent, was applied to the water body to reduce the phosphate concentration in the overlying water and permanently “cap” the sediment.

Test Result

Sixty days after the application, the total phosphorus concentration in the overlying water had stabilized at 0.03mg/L (Removal Rate: 98.3%), and the phosphate concentration had stabilized at 0.02mg/L (Removal Rate: 98.3%).

Click the link below to check the test result, before and after the pilot test, provided by the third party.

Test Result of the Water Sample 3 Days Before the Application

Test Result of the Water Sample 60 Days After the Application

Subscribe to Our Newsletter

Top posts

About Eastern Node

We are a company that emphasizes R&D and strives to continually create high-performance, environmentally friendly products to address water environment issues, large and small, worldwide.

We emphasize R&D and keep creating

high-performance, environmental-friendly solutions and products

Our main products:

silicon-based phosphorus sequestering agents
insoluble phosphorus absorbing pellets
renewable fluoride removal materials with integrated equipment
and more

More Articles

Search